Every question in the library, filed by subject — with the latest Current Affairs first.
1,875
questions
589.
Agriculture Sector
In the mid of 2016 the share of agriculture in employement was....
45%
590.
Agriculture Sector
How much is contributed by agriculture to GNP of the country?
19.53%
591.
Energy Sector
Munda Dam is an under-construction dam located on the ..... River which will generate 740 MW of Hydroelelctricity in 2017.
Gomal
592.
Energy Sector
The 4320 MW Dasu Hydro Project is one of the cascade of water resouces development projects conceived on .... river.
Indus River
593.
Energy Sector
Bunji Hydropower project would be the largest Hydro power project of Pakistan with an installed capacity of ..... MW.
7100 MW
594.
Energy Sector
What will be the installed power generation capacity of Tarbela 4th Extention?
1410 MW
595.
Energy Sector
What will be the installed power generation capacity of Neelum Jhelum Hydroelectric Project which is located in th vacinity Muzaffarabad (AJ&K) and will be completed in November 2016?
969 MW
596.
Energy Sector
What is the producing capacity of electricity of Ghazi Barotha dam?
1450 MW
597.
Energy Sector
Name the largest hydel powerstation among, Warsak, Dargai, Nandipur and Tarbela.
Tarbela
598.
Energy Sector
Water is the cause of waterlogging and sanlinity problem in Pakistan?
Uncontrolled seepage of water from rivers, canals, ponds, etc that rises underground water table.
599.
Energy Sector
Pakistan-Tukmenitan gas pipeline project will be sponsored by....
Asian Development Bank
600.
Energy Sector
Pakistan protested against India's construction of Baglihar Dam on Chenab river because....
It is violation of Indus Basin Treaty 1960