589.
Agriculture Sector

In the mid of 2016 the share of agriculture in employement was....

45%

590.
Agriculture Sector

How much is contributed by agriculture to GNP of the country?

19.53%

591.
Energy Sector

Munda Dam is an under-construction dam located on the ..... River which will generate 740 MW of Hydroelelctricity in 2017.

Gomal

592.
Energy Sector

The 4320 MW Dasu Hydro Project is one of the cascade of water resouces development projects conceived on .... river.

Indus River

593.
Energy Sector

Bunji Hydropower project would be the largest Hydro power project of Pakistan with an installed capacity of ..... MW.

7100 MW

594.
Energy Sector

What will be the installed power generation capacity of Tarbela 4th Extention?

1410 MW

595.
Energy Sector

What will be the installed power generation capacity of Neelum Jhelum Hydroelectric Project which is located in th vacinity Muzaffarabad (AJ&K) and will be completed in November 2016?

969 MW

596.
Energy Sector

What is the producing capacity of electricity of Ghazi Barotha dam?

1450 MW

597.
Energy Sector

Name the largest hydel powerstation among, Warsak, Dargai, Nandipur and Tarbela.

Tarbela

598.
Energy Sector

Water is the cause of waterlogging and sanlinity problem in Pakistan?

Uncontrolled seepage of water from rivers, canals, ponds, etc that rises underground water table.

599.
Energy Sector

Pakistan-Tukmenitan gas pipeline project will be sponsored by....

Asian Development Bank

600.
Energy Sector

Pakistan protested against India's construction of Baglihar Dam on Chenab river because....

It is violation of Indus Basin Treaty 1960